Common problems

Legal basis

The wording below is our reading of each provision, not an official translation. Only the Vietnamese text is authoritative — you can open every document in the Document lookup section.

Decree 193/2026/ND-CPSettlement of investment capital — the list of records and the content of the settlement report. Knowing the destination is what lets you design the route.
Decree 207/2026/ND-CPManagement of construction quality and maintenance — acceptance records and completion documentation.
Law on Railways — Article 23Component projects are each managed as an independent project, so the records must also be capable of being closed component by component.

What we do

  1. Build the target record listWorking backwards from what the settlement report requires: which stage must produce which document.
  2. Set a shared coding systemOne reference per component project, package and work item, so every department uses the same name.
  3. Fix mandatory collection pointsTied to acceptance and payment milestones, so records never follow the money — especially for underground and concealed works.
  4. Design storage and backupPaper and electronic, where it is held, who holds it, where it is backed up, and for how long.
  5. Schedule quarterly self-checksReview each quarter what is missing, and demand it while it can still be obtained.

What you receive

  • A settlement record list by project stage
  • A shared coding and naming convention
  • Procedures for collection, storage, backup and handover
  • A quarterly self-check sheet

When to call us

Ideally before the first package is signed. Later is still workable, but it must come with a backward review to reconstruct what has already been lost.

Two conditions, stated before anything else. First, this is a service under Clause 2, Article 40 of the Law on Independent Audit — an audit firm must register it with the Ministry of Finance before providing it. Second, if we audit your organisation, or expect to, this engagement must pass an independence check under Article 30 of the same law before signing. We run that check first, and if it fails we say so plainly and decline.

Next step

Describe your situation on the Request advice page, or call 0825092007. We read it, classify it and reply within 24 working hours — including when the answer is that the work falls outside what we are permitted to do.